
Product Advantages
1. Light weight, high strength, 50years durable use, no construction waste.
2. Quality certification: ISO9001: 2008,ISO14001:2004
3. Cost considering: Time saved, cost saved;
4. Easy move, materials can be recycled used, environmentally;
5. Used widely, used as factory, warehouse, office building, aircraft hangar etc;
6. Structural durabilities, easy maintenance.

Project Details
Item name | Low cost professional auto cad peb metal sheet panel building material steel workshop construction | |
Main structure | Material | Q345B, Q235B |
Column and beam | Welded H section steel, Hot roll H section steel, Box column is also available, Circle column | |
Surface processing | Paint or hot dip galvanized | |
Connection | High strength bolt Grade 10.9s | |
Substructure | Purlin | C channel or Z channel, steel Q235B, galvanized |
Angle brace | L50x4, Steel Q235B, Paint or hot dip galvanized | |
Cross bracing | Dia.20 round bar or L75x6 angle brace, Steel Q235B, Paint or hot dip galvanized | |
Tie bar | Dia.76*2.5 - 121*3 round pipe, Steel Q235B, Paint or hot dip galvanized | |
Purlin brace | Dia.12 round bar, Steel Q235B, Paint or hot dip galvanized | |
Connection | Ordinary bolt | |
Roof and Wall | Panel | (50mm, 75mm, 100mm, 150mm) Sandwich panel or (0.3mm - 1.2mm) corrugated GI color steel sheet |
Transparent skylight | 1.2mm FRP | |
Accessories | Sealant, self-tapping screw, rivet etc. | |
Edge cover | Made of color steel sheet | |
Gutter | Made of steel sheet thickness 0.5mm | |
Rainspout | PVC pipe | |
Others | Ventilator | Unpowered axial-flow ventilator, al fan or clerestory |
Door | Pedestrian door, rolling door/sliding door/ lifting door | |
Window | plastic steel window, Alu. alloy window | |
Crane | With or without crane, ranging from 2 tons to 20 tons |
Project Overviews




Payment and Delivery Terms
Payment Terms:T/T 30% as deposit, and the 70% balance before shipment
Packaging & Delivery: Seaworthy export standard, 20' GP, 40' GP, 40' HQ, 40' OT.
Delivery Detail: 20-45 days

Our Service
1)Rich experience and professional team
With more than 10 years' experience, our employees have been professionally trained and evaluated , we can manufacture strictly according to your drawings and request or design by ourselves to provide you a most satisfactory solution to you.
2)Advanced equipment
We also have possessed more than 80 sets of large precise and domestically advanced processing equipment, including large gantry
planning machines, automatic submerged arc welding machines, assembling machines, slitters, shot blasting machines and so on.
3)Strictly quality control, Inspection every production link
There are 2-3 quality inspection personnel in each of our workshop to carry out the product inspection and reinspection
4)Preinstall before delivery
We test assembling after assembling the first batch products, and then batch assembly if they're qualified
5)Prompt Delivery.
Within 25-60 days after the order confirmed, also depends on the fabrication quantity.
We offer One stop service from design, manufacture, deliver to installation and after-service.

About Us
Established in 2011,Qingdao Taiwei Steel Structure Co., Ltd is a large-scale professional manufacturer specializing in designing, modeling, manufacturing and installing Steel Structure Projects.
Advanced equipment, great production capacity and prompt delivery that make us establish good relationship with more than 90 countries and regions:Canada,The United States,UAE,South Africa,Germany,France,Japan,Argentina,Venezuela and many other countries and regions. And we have participated in many significant construction projects, such as Argentine Workshop, Australian Aircraft Hanger, Mauritius Government Projects and so on.

1.Are you a factory or trading company?
We're factory with competitive price.
2.Is the steel frame safe and stable?
Yes, here is the statistics: Earthquake resistance: Grade 8 or more, Wind resistance: Grade 12(wind speed≤ 120km/h)
3.What is the advantages of the steel frame compared to the traditional building?
The main advantages are light, economy, and the workers' labor intensity is low. It can be assembled quickly.
4.How can I assemble the portal H-type steel frame?
We can send you the installation instruction. If you need, we can arrange our technicians to guide the installation on site, or our construction team to install it for you.